Polaris Forge 1 capacity: 400MW, scalable to 1GW
Company: Applied Digital - Project: Polaris Forge 1
The claim, verbatim
Polaris Forge 1 in Ellendale, North Dakota is a 400MW AI Factory campus designed to scale up to 1 gigawatt over time.
Source (primary)
applied-digital 8-K exhibit (ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-29)Live source ↗
Quote: “400MW AI Factory campus in Ellendale, North Dakota ("Polaris Forge 1"), which is designed to scale up to 1 gigawatt over time”
How we checked this
Checked on October 1, 2026. The cited source supports every part of this claim.
The release describes Polaris Forge 1 as a 400MW AI Factory campus in Ellendale, North Dakota designed to scale to 1 gigawatt over time.
Confirmed in the source:
- Polaris Forge 1 is located in Ellendale, North Dakota
- Polaris Forge 1 is a 400MW AI Factory campus
- Polaris Forge 1 is designed to scale up to 1 gigawatt over time
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1144879/000149315225017609/ex99-1.htm) in full (8,205 characters, retrieved September 29, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms applied-digital 8-K exhibit (ex99-1.htm)
Quote: “400MW AI Factory campus in Ellendale, North Dakota ("Polaris Forge 1"), which is designed to scale up to 1 gigawatt over time”