Polaris Forge 1 capacity: 400MW, scalable to 1GW
Company: Applied Digital
The claim, verbatim
Polaris Forge 1 in Ellendale, North Dakota is a 400MW AI Factory campus designed to scale up to 1 gigawatt over time.
Source (primary)
applied-digital 8-K exhibit (ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-29)Live source ↗
Quote: “400MW AI Factory campus in Ellendale, North Dakota ("Polaris Forge 1"), which is designed to scale up to 1 gigawatt over time”