Polaris Forge 2 efficiency and sustainability specifications
Company: Applied Digital - Project: Polaris Forge 2
The claim, verbatim
Polaris Forge 2 is engineered to deliver best-in-class efficiency with a projected PUE of 1.18 and near-zero water consumption across more than 900 acres.
Source (primary)
applied-digital 8-K exhibit (ad-harwood_prxfinal102225.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-27)Live source ↗
Quote: “Spanning more than 900 acres, Polaris Forge 2 is engineered to deliver best-in-class efficiency with a projected PUE of 1.18 and near-zero water consumption.”
How we checked this
Checked on September 29, 2026. The cited source supports every part of this claim.
The release states the acreage, projected PUE of 1.18 and near-zero water consumption; 'best-in-class' is the company's own characterization.
Confirmed in the source:
- Polaris Forge 2 spans more than 900 acres
- Polaris Forge 2 is engineered for a projected PUE of 1.18
- Polaris Forge 2 is designed for near-zero water consumption
- The company describes the campus's efficiency as best-in-class
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1144879/000114487925000076/ad-harwood_prxfinal102225.htm) in full (8,227 characters, retrieved September 27, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms applied-digital 8-K exhibit (ad-harwood_prxfinal102225.htm)
Quote: “Spanning more than 900 acres, Polaris Forge 2 is engineered to deliver best-in-class efficiency with a projected PUE of 1.18 and near-zero water consumption.”