Calvert City Kentucky billable power
Company: Core Scientific - Project: Calvert City
The claim, verbatim
Calvert City, Kentucky site has approximately 100 MW of billable power as future colocation site
Source (primary)
core-scientific 8-K exhibit (ef20057996_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-27)Live source ↗
Quote: “Calvert City, Kentucky Total Billable Power ~100MW”
How we checked this
Checked on September 29, 2026. The cited source supports every part of this claim.
Calvert City is listed at about 100 MW of billable power with status Future Colocation Site.
Confirmed in the source:
- The Calvert City, Kentucky site has approximately 100 MW of total billable power
- The Calvert City, Kentucky site is designated as a future colocation site
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1839341/000114036125039864/ef20057996_ex99-1.htm) in full (11,284 characters, retrieved September 27, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms core-scientific 8-K exhibit (ef20057996_ex99-1.htm)
Quote: “Calvert City, Kentucky Total Billable Power ~100MW”