Pecos, TX Expansion Capacity

Company: Core Scientific - Project: Cottonwood

Subject kind
facility capacity
Statement date
2026-05-06
Promised amount
1500.0 MW
Current status
stated

The claim, verbatim

Pecos, TX site planned to expand with approximately 300 MW of additional grid-connected utility power and behind-the-meter solutions for total gross power capacity potential of approximately 1.5 GW

Source (primary)

First Quarter Fiscal Year 2026 Earnings Presentation (IR page (investors.corescientific.com), ir_presentation)
View cached copy (2026-09-26)Live source ↗Archive.org ↗

Quote: “Pecos, TX Anticipated Power Details ~300 MW + ~300 MW + Behind-the-Meter = CURRENT AVAILABLE POWER ADDITIONAL GRID-CONNECTED UTILITY POWER ~1.5 GW TOTAL GROSS POWER CAPACITY POTENTIAL ... Confirmed with utility; allocation timing is to be determined”

How we checked this

Checked on October 12, 2026. The cited source supports every part of this claim.

The Pecos slide shows ~300 MW current plus ~300 MW additional grid-connected power plus behind-the-meter power, totaling ~1.5 GW. The additional power is confirmed with the utility but its allocation timing is undetermined.

Confirmed in the source:

What we did: Read our cached copy of IR page (investors.corescientific.com) (https://d1io3yog0oux5.cloudfront.net/_fda3a1f2f1890adaa7ac6c4d9d310971/corescientific/db/1066/11271/pdf/Q1+FY26+earnings+deck.pdf) in full (14,811 characters, retrieved September 26, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms First Quarter Fiscal Year 2026 Earnings Presentation

Quote: “Pecos, TX Anticipated Power Details ~300 MW + ~300 MW + Behind-the-Meter = CURRENT AVAILABLE POWER ADDITIONAL GRID-CONNECTED UTILITY POWER ~1.5 GW TOTAL GROSS POWER CAPACITY POTENTIAL ... Confirmed with utility; allocation timing is to be determined”

View cached copy (2026-09-26)Live source ↗Archive.org ↗

Record of changes

September 26, 2026 — stated
Automated extraction from the cited source. Recorded automatically from the cited source when it was published, then queued for evidence review.
October 9, 2026 — stated
Review. statement_date 2026-09-26 was the source's retrieval date; source published 2026-05-06.