Midas Green Technologies, LLC v. Green Revolution Cooling, Inc. — Entry #1: Motion to Compel (compliance with a subpoena) (Filing fee $ 52

Case: Midas Green Technologies, LLC v. Green Revolution Cooling, Inc. txed · 6:25-mc-00008

filed August 19, 2025

What this document is

Docket entry #1 · filed August 19, 2025

Motion to Compel (compliance with a subpoena) (Filing fee $ 52; Receipt number ATXEDC-11035679), filed by Midas Green Technologies, LLC. (Attachments: # 1 Proposed Order, # 2 Exhibit Exhibit A, # 3 Exhibit Exhibit B, # 4 Exhibit Exhibit C, # 5 Exhibit Exhibit D, # 6 Exhibit Exhibit E, # 7 Exhibit Exhibit F, # 8 Exhibit Exhibit G, # 9 Exhibit Exhibit H)(Pogorzelski, Henry) (Entered: 08/19/2025)

Who is involved

Why we have it

We follow this case because it names a company we track, although that company is not a party:

A free copy from the RECAP archive of federal court filings (mirrored at the Internet Archive), retrieved November 15, 2026. Federal court filings are public records.

URL
https://archive.org/download/gov.uscourts.txed.239873/gov.uscourts.txed.239873.1.0.pdf
Kind
court_filing
Publisher
RECAP
Published
2025-08-19 00:00:00-04:00
Retrieved
2026-11-15 07:41:33.727239-05:00
HTTP status
200
MIME
application/pdf
Bytes
205123
SHA-256
e307820d70dd45db385487e92ac54f57e789bed07c7301689fbeee51c27425c2

Document text

10 page(s), 19,713 characters, converted from the PDF's text layer · plain text.

Full text
Case 6:25-mc-00008-JDK            Document 1   Filed 08/19/25   Page 1 of 10 PageID #: 1


                            IN THE UNITED STATES DISTRICT COURT
                             FOR THE EASTERN DISTRICT OF TEXAS
                                       TYLER DIVISION

 IN RE: SUBPOENAS TO ENGINEERED Misc. Action No. _____
 FLUIDS, INC.


 MIDAS GREEN TECHNOLOGIES, LLC                 Underlying Case Pending in: 6-24-cv-00166-
                                               ADA (W.D. Tex.)
          Plaintiff,

                  - vs. -

 GREEN REVOLUTION COOLING,

          Defendant.


          MOTION TO COMPEL COMPLIANCE WITH SUBPOENA DIRECTED
           TO ENGINEERED FLUIDS, INC. PURSUANT TO FED. R. CIV. P. 45


1601291703.3


Case 6:25-mc-00008-JDK            Document 1          Filed 08/19/25   Page 2 of 10 PageID #: 2


         Midas Green Technologies, LLC (“Midas”) respectfully moves to compel the production

of documents and a deposition by Engineered Fluids, Inc. (“Engineered Fluids”) in response to

Midas’s Subpoena to Testify at a Deposition in a Civil Action (the “Subpoena for Testimony”)

(Ex. A) and its Subpoena to Produce Documents, Information, or Objects or to Permit Inspection

of Premises in a Civil Action (the “Subpoena for Documents”) (Ex. B) on June 23, 2025

(collectively “Subpoenas”) in the underlying patent infringement action pending in the Western

District of Texas, Midas Green Technologies, LLC v. Green Revolution Cooling, Inc., Case No.

6:24-cv-00166-ADA (“Midas v. GRC Case”).

I.       INTRODUCTION

         On June 23, 2025, Midas served the Subpoenas on Engineered Fluids, seeking among other

things, discovery of certain relevant information, including evidence related to copying and other

secondary considerations of non-obviousness, as well as whether Engineered Fluids has sold

immersion cooling systems relevant to the damages claims in this action. The Subpoenas also seek

evidence regarding any undisclosed arrangements between Engineered Fluids and Green

Revolution Cooling, Inc. (“GRC”). These documents and testimony are highly relevant and critical

to the Midas v. GRC Case, including damages and validity issues. Engineered Fluids initially

represented that it would retain counsel and respond to Midas’s Subpoenas, and that it would

respond to multiple subpoenas issued by GRC. But now despite Midas’s repeated efforts to engage

and accommodate Engineered Fluids, the company has failed to comply with its obligations under

the Subpoena and has ceased responding to Midas’s communications since July 11, 2025.

II.      STATEMENT OF FACTS

         A. The Underlying Litigation Between Midas and GRC

         The underlying lawsuit in this action is a patent infringement suit brought by Midas against

GRC. Midas is the owner of United States Patent No. 10,405, 457 (the “Asserted Patent”) issued

                                                  2
1601291703.3


Case 6:25-mc-00008-JDK          Document 1          Filed 08/19/25   Page 3 of 10 PageID #: 3


on September 3, 2019 and titled “Appliance Immersion Cooling System.” See Ex. C (Midas’s

Complaint for Patent Infringement at ¶ 6). Midas alleges that GRC infringes the Asserted Patent

by making, offering for sale and/or selling infringing certain immersion cooling tanks and related

products that are used to cool electronic components such as computer servers used in data centers.

GRC denies infringement and alleges that the Asserted Patent is invalid.

         Engineered Fluids is a Tyler-based supplier of immersion cooling tanks, as well as the

dielectric fluids that are used in immersion cooling tanks. See Ex. D (LinkedIn Profile). Midas

issued the Subpoenas to Engineered Fluids after realizing, through subpoenas served by GRC, that

Engineered Fluids may possess critical information relevant to issues of validity and damages in

this case.

         B. The Subpoena Served On Engineered Fluids

         Midas issued the Subpoenas on June 23, 2025. On June 25, 2025, the Subpoenas were

hand-served on Engineered Fluids’ co-founder Dr. David Sundin for service of process in Tyler,

Texas. The Subpoenas list 12 topics for oral testimony and eight categories of document requests.

Ex. E (Proof of Service for Subpoena for Testimony) and Ex. F (Proof of Service for Subpoena

for Documents).

         C. Engineered Fluids’ Refusal To Comply With the Subpoena

         Midas’s subpoenas directed Engineered Fluids to produce responsive documents by

July 2, 2025 and appear for a remote deposition on July 9, 2025. On June 30, 2025, Gary Testa,

President and Chief Executive Officer of Engineered Fluids, emailed counsel for Midas requesting

a meeting to discuss the Subpoenas. Ex. G (Email Correspondence Between Mr. Testa and Midas’s

Counsel) During a video meet-and-confer held on July 1, Mr. Testa indicated that Engineered

Fluids would be unable to comply with the document production deadline, citing the need to retain

counsel and gather the requested materials. Mr. Testa also expressed a preference to coordinate

                                                3
1601291703.3


Case 6:25-mc-00008-JDK                Document 1            Filed 08/19/25      Page 4 of 10 PageID #: 4


with GRC to identify a mutually agreeable deposition date that would allow both Midas and GRC

to conduct their respective depositions.1 The parties agreed to revisit the matter the following

week, after Engineered Fluids engaged counsel.

         On July 10, 2025, counsel for GRC contacted Midas’s counsel, stating that she had not

received any communication from Engineering Fluids regarding its subpoenas but intended to

proceed with the deposition. Midas’s counsel included Mr. Testa into the email chain, and on July

11, 2025, he responded that he had not received any correspondence from GRC’s counsel

regarding its subpoenas. He further stated that he was in the process of finalizing his selection of

legal counsel for this matter and would schedule a deposition thereafter. That was the last

communication from Mr. Testa that Midas’s counsel received. On July 24, 2025, Midas’s counsel

reached out to Mr. Testa again to request a formal conferral regarding compliance with the

Subpoenas. Mr. Testa did not respond, and a voicemail left by Midas’s counsel also went

unanswered. Ex. H (Email Correspondence Between Mr. Testa, Midas’s Counsel and GRC’s

counsel). This lack of engagement is particularly concerning given that fact discovery for the

Midas v. GRC Case concludes on September 1, 2025.

III.     ARGUMENTS

         A. Legal Standard

         Federal Rule of Civil Procedure 26(b) governs the scope of discovery. The rule provides

that “parties may obtain discovery regarding any non-privileged matter that is relevant to any

party’s claim or defense and proportional to the needs of the case.” Fed. R. Civ. P. 26(b)(1). Federal

Rule of Civil Procedure 45 establishes, inter alia, nonparties’ duties to respond to subpoenas. Rule

45(a)(D) directs that a “command in a subpoena to produce documents, electronically stored


1
 GRC has also served similar subpoenas on Engineered Fluids in this matter (see Docket [065]), as well as in Green
Revolution Cooling, Inc. v. Riot Platforms, Inc., Case No. 6:24-cv-152 (W.D. Tex).

                                                        4
1601291703.3


Case 6:25-mc-00008-JDK           Document 1           Filed 08/19/25   Page 5 of 10 PageID #: 5


information, or tangible things requires the responding party to permit inspection, copying, testing,

or sampling of the materials.”

         The scope of discovery under a subpoena is the same as the scope of discovery under Rules

26(b) and 34. See FED. R. CIV. P 45(d)(1); Cunningham v. Concentrix Sols. Corp., No. 4:20-cv-

00661, 2021WL 425098, at *2 (E.D. Tex. Feb. 8, 2021) (holding that “[w]hen determining if a

subpoena is relevant, courts apply the relevancy standard from Rule 26(b)(1)”); Folkenflik v.

Chapwood Cap. Inv. Mgmt., LLC, No. 4:20-MC-00036, 2020 WL 9936142, at *3 (E.D. Tex. June

5, 2020) (citing Zamora v. GC Servs., L.P., No. P-15-CV-00048-DCG, 2017 WL 1861843, at *3

(W.D. Tex. Feb. 17, 2017)). (“the scope of discovery through a Rule 45 subpoena is governed by

Rule 26(b)). “[T]he bar for relevancy is low and includes any matter that could bear on, any issue

that is or may be in the case.” United States ex rel. Eichner v. Ocwen Loan Servicing LLC, No.

4:19-CV-00524, 2024 WL 2922979, at *8 (E.D. Tex. June 10, 2024). As the entity resisting

discovery, Engineered Fluids bears the burden to establish that the requested discovery is improper.

See Donaldson v. Crisp, No. 1:22-CV-111, 2023 U.S. Dist. LEXIS 168873, at *8 (E.D. Tex. Sep.

21, 2023).

         If the subpoenaed party intends to object, objections must be served before the time

specified for compliance or fourteen days after the subpoena is served. See Fed. R. Civ. P.

45(d)(2)(B). “The failure to serve written objections to a subpoena within the time specified by

Rule 45(d)(2)(B) typically constitutes a waiver of such objections” Folkenflik, 2020 WL 9936142,

at *4; Ring Plus Inc. v. Cingular Wireless, LLC, No. 2:06-CV-1592007 WL 9702621, at *2 (E.D.

Tex. July 26, 2007) (citing Laughon v. Jacksonville Sheriff's Office, 2007 WL 1247305, at *2

(M.D. Fla. Apr. 30, 2007) (“protective order is not timely if it is filed after the date the discovery

material was to be produced.”). In the Fifth Circuit, courts have consistently held that failure to


                                                  5
1601291703.3


Case 6:25-mc-00008-JDK                  Document 1            Filed 08/19/25       Page 6 of 10 PageID #: 6


serve timely objections to a Rule 45 subpoena generally results in a waiver of all grounds for

objection, including privilege. See Walters v. FedEx Custom Critical, Inc., No. 4:15-CV-00069,

2016 WL 11976001, at *3 (E.D. Tex. Apr. 8, 2016) (quoting Isenberg v. Chase Bank USA, N.A.,

661 F. Supp. 2d 627, 629 (N.D. Tex. 2009)).

           B. Engineered Fluids Must Comply with Midas’s Subpoenas and Provide Responsive
              Documentation and Testimony

           Midas’s Subpoenas to Engineered Fluids were properly issued by this Court under the

authority of Federal Rule of Civil Procedure 45. Engineered Fluids was properly served on June

25, 2025, triggering July 2, 2025 document production and July 9, 2025 deposition deadlines.

Midas’s Subpoenas are tailored to seek relevant information tied to the claims and defenses at

issue in the underlying Midas v. GRC case and they are well within the broad scope of Rule 26(b)

as Midas pursues infringement claims of the Asserted Patent against GRC.

           These documents and deposition topics sought by Midas are relevant for patent validity

and damages issues. Document Request Nos. 5(a)-5(c), as well as Deposition Topic Nos. 7, 11

and 12, are directed to Engineering Fluid’s competing immersion cooling products.                       This

information is relevant, for example, to copying by others—an established secondary factor of

patent validity—as well as to the absence of acceptable non-infringing substitutes, which is

pertinent to lost profits and reasonable royalty damages. Document Request No. 7, as along with

Deposition Topic Nos. 3 and 8, are directed to awareness of the patent rights of Midas, GRC, and

others, and are also relevant to copying by others.2 Thus, the Subpoenas request documents and

testimony that fall squarely within the scope of relevance contemplated by the Federal Rules. See

Fed. R. Civ. P. 26.


2
    This Motion is limited to only these document requests and deposition topics. See Proposed Order.

                                                          6
1601291703.3


Case 6:25-mc-00008-JDK            Document 1          Filed 08/19/25   Page 7 of 10 PageID #: 7


         Engineered Fluids has demonstrated a complete failure to fulfill its obligations to properly

respond to the Subpoenas. Indeed, Engineered Fluids was served with the Subpoenas over 50 days

ago, but has failed to serve objections, move to quash the Subpoenas, or move for protective order

within the time allotted by the Federal Rules. While Mr. Testa initially asked for an extension, he

has not responded to Midas regarding this matter since July 11. Engineered Fluids has thereby

waived any objection it may have had with respect to the Subpoenas, the deposition or the

production of responsive documents. Per Rule 45(e)(1)(A), Engineered Fluids was required “to

produce documents . . . as they are kept in the ordinary course of business.” Midas has made

repeated efforts to accommodate Engineering Fluids’ need for time to retain counsel and produce

documents, as well as offering to conduct its deposition on the same day as GRC’s to minimize

burden. However, Engineered Fluids has ignored all attempts to encourage its compliance with the

Subpoenas. Engineered Fluids’ refusal to participate deprives Midas of highly probative evidence

that rebuts invalidity arguments and supports its damages theory with the close of fact discovery

fast approaching on September 1, 2025. Accordingly, Midas respectfully requests the Court to

compel third-party Engineered Fluids to immediately comply with the Subpoenas by producing all

responsive documents and communications, and by appearing for a deposition.

         C. Midas Is Entitled to Recover Its Attorneys’ Fees

         As discussed above, Rule 45 required Engineered Fluids to respond to the Subpoenas by

July 2. Engineered Fluids is a sophisticated company with experience in responding to subpoenas,

and is presumed to understand its legal obligations and to respect the authority of the Court. As

such, Engineered Fluids’ decision to ignore its legal obligations is inexcusable. Accordingly,

Midas requests that the Court also award Midas its reasonable attorneys’ fees associated with

bringing this motion. Under Rule 37, once a motion to compel is granted, the Court is required to

award attorneys’ fees. Specifically, after giving the compelled party an opportunity to be heard,
                                                  7
1601291703.3


Case 6:25-mc-00008-JDK           Document 1         Filed 08/19/25   Page 8 of 10 PageID #: 8


the Court must “require the party or deponent whose conduct necessitated the motion, the party or

attorney advising that conduct, or both to pay the movant’s reasonable expenses incurred in making

the motion, including attorney’s fees.” Rule 37(a)(5)(A). In this case, there is no question that

Engineered Fluids has relevant information but has failed to uphold its duties to respond to the

Subpoenas. Accordingly, the Court should award Midas its reasonable attorneys’ fees as it was

Engineered Fluids’ conduct that necessitated this motion.

IV.      CONCLUSION

         For the foregoing reasons, Midas respectfully requests that the Court compel Engineered

Fluids to produce responsive documents to the Subpoenas; order Engineered Fluids to appear for

deposition on a date certain; award Midas its reasonable attorneys’ fees and costs incurred in

bringing this motion; and grant any other relief this Court deems just and proper.

         A proposed order is attached.

Dated: August 19, 2025


                                               Respectfully submitted,

                                               By: /s/ Henry Pogorzelski
                                                    Henry Pogorzelski
                                                    TX Bar No. 24007852
                                                    Henry.Pogorzelski@KLGates.com
                                                    Matthew Blair
                                                    TX Bar No. 24109648
                                                    Matthew.Blair@KLGates.com
                                                    Ryan R. Elson
                                                    Texas Bar No. 24143987
                                                    Ryan.Elson@klgates.com
                                                    K&L Gates LLP
                                                    2801 Via Fortuna, Suite 650
                                                    Austin, Texas 78746
                                                    Tel.: (512) 482-6800
                                                    Fax: (512) 482-6859
                                                8
1601291703.3


Case 6:25-mc-00008-JDK   Document 1       Filed 08/19/25   Page 9 of 10 PageID #: 9


                                           Victoria Forson
                                           TX Bar No. 24118212
                                           Victoria.Forson@KLGates.com
                                           K&L Gates LLP
                                           1717 Main Street, Suite 2800
                                           Dallas, Texas 75201
                                           Tel.: (214) 939-5500
                                           Fax: (214) 939-5849

                                            ATTORNEYS FOR PLAINTIFF
                                            MIDAS GREEN TECHNOLOGIES, LLC


                                      9
1601291703.3


Case 6:25-mc-00008-JDK            Document 1        Filed 08/19/25      Page 10 of 10 PageID #: 10


                                   CERTIFICATE OF SERVICE

         I certify that on August 19, 2025, I electronically filed the foregoing document(s) and that

they are available for viewing and downloading from the Court’s CM/ECF system, and that the

participants in the case that are registered CM/ECF users will be served electronically by the

CM/ECF system. I further certify that a copy of the foregoing document(s) was emailed, to the

person(s) listed below:

Respondent Engineered Fluids, Inc.                      Counsel for Green Revolution Cooling, Inc.
c/o Gary Testa                                          Ashley N. Moore
4917 Profit Drive                                       Greenberg Traurig, LLP
Tyler, Texas 75707                                      2200 Ross Avenue, Suite 5200
gary.testa@engineeredfluids.com                         Dallas, Texas 75202
                                                        Ashley.Moore@gtlaw.com
                                                        GRC-Midas@gtlaw.com

         I further hereby certify that I will cause to be served a true and correct copy of the foregoing

Motion to Compel Compliance with Subpoena Directed to Engineered Fluids, Inc. and all

supporting papers in accordance with Rule 45 of the Federal Rules of Civil Procedure, upon:

Respondent Engineered Fluids, Inc.
c/o David Sundin
4917 Profit Drive
Tyler, Texas 75707
                                                                /s/ Henry Pogorzelski
                                                                Henry Pogorzelski

                               CERTIFICATE OF CONFERENCE

         I hereby certify that counsel for Midas Green Technologies, LLC has attempted to resolve

this dispute with non-party Engineered Fluids, Inc. However, at the time of filing Engineered

Fluids continued to ignore its obligations under the Federal Rules and has ceased responding to

Midas’s communications.

                                                              /s/ Henry Pogorzelski
                                                              Henry Pogorzelski


                                                   10
1601291703.3