TeraWulf signed an agreement in late 2025 to buy the Morgantown Generating Station in Charles County, Maryland. The plant has about 210 MW of existing generation, and TeraWulf plans to convert it to natural gas and expand it to about 1,000 MW for a potential data center campus. FERC authorized the purchase on July 29, 2026, but as of the August 2026 10-Q the deal had not closed and was expected to close in the second half of 2026. No construction or TeraWulf-operated capacity is reported, and the 210 MW is the existing plant's generation, not in-service project capacity.
1,000 MW planned
| Phase | MW | Status | Date | Source |
|---|---|---|---|---|
| Existing Morgantown generation (pending acquisition) | 210 | planned | a grid-connected power generation facility with approximately 210 MW of current operational capacity, including electrical infrastructure, associated real property, contracts and other assets 2026-08-04 View cached copy (2026-08-31)Live source ↗ | |
| Expansion / natural-gas conversion to support data center campus | 1000 | planned | The Easton-based company plans to pivot the former coal plant to natural gas, eventually supporting 1,000 megawatts of capacity to power a potential data center campus. 2026-08-16 View cached copy (2026-08-31)Live source ↗ |
Assessed October 18, 2026 from the newest filings, releases and reporting that name this project (newest relied on: August 24, 2026).
Capacity
What has actually been delivered, against what has been promised. Each figure links to the statement it came from.
| Stage | Capacity | As of | Source |
|---|---|---|---|
| Energized power flowing today | 210 MW | 2026-02-01 | Morgantown generating station operational capacity |
| Contracted a customer is on the hook | -- | ||
| Under construction | -- | ||
| Permitted | -- | ||
| Interconnect approved utility has agreed to deliver | -- | ||
| Interconnect requested in a queue, nothing approved | -- | ||
| Announced a press-release figure | 1,000 MW | 2026-08-16 | Planned 1,000 MW capacity at Morgantown generating station |
Claims about this project
Site intelligence
How we located this site
- Starting point (the project's stated locality) 2026-10-19
12620 Crain Hwy, Newburg, MD 20664 → 38.36800, -76.96315 (street) - Located from a published address 2026-10-19
Morgantown Generating Station → 38.35986, -76.97120 (footprint), 1.1 km from seed - Located from a published address 2026-10-19
12620 Crain Hwy, Newburg, MD 20664 → 38.36800, -76.96315 (street) - OpenStreetMap features nearby 2026-10-19
1 named match(es)
- 2023-02-04 vs 2022-12-26: new roof or pavement visible
- 2023-08-31 vs 2023-07-30: clearing or grading visible
- 2023-12-29 vs 2023-11-27: clearing or grading visible
- 2024-02-04 vs 2024-01-20: new roof or pavement visible
- 2024-05-21 vs 2024-04-03: vegetation recovery visible
Satellite imagery on this page is drawn from the Google Earth satellite basemap, USDA NAIP aerial photography (~1 m/pixel), ESA Sentinel-2 multispectral (10 m, with per-date cloud masks), NASA / USGS Landsat 8/9 (30 m, plus surface temperature), ESA Sentinel-1 radar (all-weather, night), NASA ECOSTRESS thermal (~70 m), and NASA Black Marble night lights (500 m, daily). Each image is dated, labelled by source and pixel resolution, and downloadable at its native size; cloudy dates are kept and marked rather than hidden. New scenes are pulled daily as each provider publishes them.