Sweetwater Hub
Project of IREN
Where it stands
IREN's 2GW Sweetwater Hub has two facilities: Sweetwater 1 (1,400MW) and Sweetwater 2 (600MW). Both were conditionally included in ERCOT's Batch Zero as Base Load in September 2026. The Sweetwater 1 high-voltage substation is energized, and 300MW (gross) of data center capacity is under construction there, targeted for delivery in Q4 2027. No data center capacity is reported in service; the 'freshly energized' wording in P20 refers to the substation, and the remaining 1,700MW is pre-construction or planning.
300 MW under construction · 2,000 MW planned
| Phase | MW | Status | Date | Source |
|---|---|---|---|---|
| Sweetwater 1 - initial phase | 300 | under construction | Construction is currently underway for 300MW (gross) of data center capacity at this site. The company targets delivery of this initial phase in Q4 2027. 2026-09-14 View cached copy (2026-09-20)Live source ↗ | |
| Sweetwater 1 | 1400 | under construction | together with continued construction at Sweetwater 1 and GPU installations at Mackenzie and Prince George. 2026-10-12 View cached copy (2026-10-14)Live source ↗ | |
| Sweetwater 2 | 600 | planned | The Sweetwater Hub consists of two distinct facilities: Sweetwater 1 with a capacity of 1,400MW and Sweetwater 2 with 600MW 2026-09-14 View cached copy (2026-09-20)Live source ↗ |
Assessed October 18, 2026 from the newest filings, releases and reporting that name this project (newest relied on: October 12, 2026).
Capacity
What has actually been delivered, against what has been promised. Each figure links to the statement it came from.
| Stage | Capacity | As of | Source |
|---|---|---|---|
| Energized power flowing today | 2,000 MW | 2026-09-15 | 2GW Sweetwater Hub integration to ERCOT |
| Contracted a customer is on the hook | -- | ||
| Under construction | 2,000 MW | 2025-05-13 | Sweetwater site works underway |
| Permitted | -- | ||
| Interconnect approved utility has agreed to deliver | -- | ||
| Interconnect requested in a queue, nothing approved | -- | ||
| Announced a press-release figure | 2,000 MW | 2026-10-11 | Sweetwater campus 2 GW planned gross power capacity |
Claims about this project
Site intelligence
How we located this site
- Starting point (the project's stated locality) 2026-10-28
Sweetwater, Texas → 32.47095, -100.40594 (locality) - No site-level evidence yet 2026-10-28
no address, road, landmark or coordinates tie this project to a specific parcel yet -- the town is shown, NOT the site - OpenStreetMap features nearby 2026-10-28
0 named match(es)