Sweetwater 2GW data center hub
Company: IREN
The claim, verbatim
Together, Sweetwater 1 and Sweetwater 2 are expected to create a 2GW Sweetwater data center hub, with design work underway for a direct fiber loop between the two sites.
Source (primary)
iren 8-K exhibit (q2fy25resultspressreleas.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-20)Live source ↗
Quote: “new 600MW site, expected to create a 2GW Sweetwater Data Center Hub ... Design work underway for direct fiber loop between Sweetwater 1 and 2”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms iren 8-K exhibit (q2fy25resultspressreleas.htm)
Quote: “new 600MW site, expected to create a 2GW Sweetwater Data Center Hub ... Design work underway for direct fiber loop between Sweetwater 1 and 2”