Sweetwater 2GW HPC data center hub

Company: IREN - Project: Sweetwater Hub

Subject kind
facility capacity
Statement date
2025-05-13
Promised amount
2000.0 MW
Current status
stated

The claim, verbatim

IREN is developing Sweetwater 1 and Sweetwater 2 and designing a direct fiber loop between them to potentially create a 2GW data center hub for HPC solutions.

Source (primary)

iren 8-K exhibit (irenlimited-exx994mar2025.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-15)Live source ↗

Quote: “designing a direct fiber loop between the two sites to potentially create a 2GW data center hub for HPC solutions”

How we checked this

Checked on October 17, 2026. The cited source supports every part of this claim.

The filing states that IREN is developing both Sweetwater projects and designing a direct fiber loop between them to potentially create a 2GW data center hub for HPC solutions.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1878848/000187884825000043/irenlimited-exx994mar2025.htm) in full (129,213 characters, retrieved October 15, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms iren 8-K exhibit (irenlimited-exx994mar2025.htm)

Quote: “designing a direct fiber loop between the two sites to potentially create a 2GW data center hub for HPC solutions”