Tazewell
Project of CleanSpark
Where it stands
CleanSpark acquired Tazewell Technologies LLC, an existing bitcoin mining facility in Tazewell, TN, under the Third MIPA, which closed on September 25, 2024. The November 2025 10-K still lists Tazewell among the company's bitcoin mining facilities. The 40 MW figure in the filings covers several MIPA 3 sites together, including at least Oneida and Tazewell, so no capacity is assigned to Tazewell alone.
| Phase | MW | Status | Date | Source |
|---|---|---|---|---|
| Tazewell bitcoin mining facility (MIPA 3 acquisition) | operational | 2024-09-25 | MIPA 3: Winfield, TN; Oneida, TN; and Tazewell, TN. The Company completed the acquisition of MIPA 1 and MIPA 3 on September 16, 2024 and September 25, 2024, respectively. 2024-12-02 View cached copy (2026-08-31)Live source ↗ |
Assessed October 18, 2026 from the newest filings, releases and reporting that name this project (newest relied on: November 24, 2025).
Claims about this project
Site intelligence
How we located this site
- Initial geocode 2026-09-05
Tazewell, Tennessee, TN → town/county centre, 4 km box -- not the site - Nearest substation (earlier method) 2026-09-05
re-centred on the nearest high-voltage substation (superseded method) - Starting point (the project's stated locality) 2026-10-19
Tazewell, Tennessee → 36.45425, -83.56935 (locality) - No site-level evidence yet 2026-10-19
no address, road, landmark or coordinates tie this project to a specific parcel yet -- the town is shown, NOT the site - OpenStreetMap features nearby 2026-10-19
0 named match(es)
Satellite imagery on this page is drawn from the Google Earth satellite basemap. Each image is dated, labelled by source and pixel resolution, and downloadable at its native size; cloudy dates are kept and marked rather than hidden. New scenes are pulled daily as each provider publishes them.