jain.com

Brazoria

Project of CleanSpark

Kind
datacenter
Location
Brazoria, Texas
County
Brazoria County
State/region
TX
Country
US
Status
announced as of October 10, 2026

Where it stands

CleanSpark bought land in Brazoria County, Texas on February 27, 2026 and added adjacent land on May 28, 2026, giving a 447-acre campus. The plan is an initial 300 MW load with potential to grow to 600 MW. ERCOT granted conditional base load classification for 300 MW, and a separate 300 MW studied-load request awaits Batch Zero results. No passage reports construction or energized capacity. The Sandersville tenant (Meta) holds exclusivity over the Sealy and Brazoria sites, but no lease is signed, and Texas has halted data center permits pending an audit.

300 MW planned

PhaseMWStatusDateSource
Initial demand load300plannedCleanSpark said ERCOT granted it 585 MW of conditional base load classification, including 300 MW at its Brazoria site and 285 MW at Sealy.
2026-09-10 View cached copy (2026-09-11)Live source ↗
Expansion to 600 MW300planned447 acres at the Brazoria campus, where transmission-level infrastructure supports an initial 300 MW demand load with the potential to expand to 600 MW.
2026-07-13 View cached copy (2026-09-03)Live source ↗

Assessed October 18, 2026 from the newest filings, releases and reporting that name this project (newest relied on: October 10, 2026).

Capacity

What has actually been delivered, against what has been promised. Each figure links to the statement it came from.

StageCapacityAs ofSource
Energized power flowing today--
Contracted a customer is on the hook--
Under construction--
Permitted--
Interconnect approved utility has agreed to deliver300 MW2026-09-10Brazoria site conditional base load approval
Interconnect requested in a queue, nothing approved300 MW2026-09-17Studied load capacity at Brazoria
Announced a press-release figure600 MW2026-07-14Brazoria Campus Power Capacity

Who has claimed this site

Capacity commitments in the order they were announced. A commitment that ended shows why.

2026-09-17
Meta Platforms - offtaker source

Claims about this project

2026-07-14 - stated
2026-08-21 - stated
2026-09-17 - stated
Studied load capacity at Brazoria 300.0 MW. Promised by 2027-04-01.
2026-10-10 - stated

Site intelligence

Analytical estimate. Each site below is located from public records (filings, releases, news, OpenStreetMap) and checked against free satellite imagery; "How we located this site" lists every step and the score it earned. The conclusion is computed from night-time lights, surface heat and year-over-year change, with the dates it rests on. These are hypotheses under active tracking, not legal parcels or an official endorsement.
Brazoria, Texas
Weak
Brazoria County, TX
29.0444, -95.5691
Approximate address 114 E Texas St, Brazoria, TX 77422, USA Reverse-geocoded from the candidate centroid; not a permit-confirmed parcel address.
Conclusion so far We have not located the site yet. · confidence 30%
Undetermined: we have not yet located the actual site, only the town or county it is in, so imagery cannot say whether anything is running.
What would change this: A published address, parcel, coordinates or permit for the site itself.
Latest clear imagery: Google 2026-09-29
Newest clear images2 clear image date(s)
Visual view of cleanspark-brazoria, 2026-09-29 (Google Earth (wide view))
2026-09-29Google Earth (wide view) · 4.18 m/pixel
Visual view of cleanspark-brazoria, 2026-09-29 (Google Earth (close view))
2026-09-29Google Earth (close view) · 0.52 m/pixel
How we located this site
5/100 (weak): locality location 5
  1. Starting point (the project's stated locality) 2026-10-28
    Brazoria, Texas → 29.04442, -95.56911 (locality)
  2. No site-level evidence yet 2026-10-28
    no address, road, landmark or coordinates tie this project to a specific parcel yet -- the town is shown, NOT the site
  3. OpenStreetMap features nearby 2026-10-28
    0 named match(es)

Satellite imagery on this page is drawn from the Google Earth satellite basemap. Each image is dated, labelled by source and pixel resolution, and downloadable at its native size; cloudy dates are kept and marked rather than hidden. New scenes are pulled daily as each provider publishes them.