Brazoria campus 447 acres with 300-600 MW potential
Company: CleanSpark - Project: Brazoria
The claim, verbatim
Brazoria campus comprises 447 acres with transmission-level infrastructure supporting initial 300 MW demand load and potential expansion to 600 MW
Source (primary)
cleanspark 8-K exhibit (clsk-ex99_1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-03)Live source ↗
Quote: “447 acres at the Brazoria campus, where transmission-level infrastructure supports an initial 300 MW demand load with the potential to expand to 600 MW”
How we checked this
Checked on September 19, 2026. The cited source supports every part of this claim.
The document states 447 acres at Brazoria with transmission-level infrastructure supporting an initial 300 MW load expandable to 600 MW.
Confirmed in the source:
- CleanSpark's Brazoria campus comprises 447 acres
- The Brazoria campus has transmission-level infrastructure supporting an initial 300 MW demand load
- The Brazoria campus has potential to expand to 600 MW
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/827876/000119312526302448/clsk-ex99_1.htm) in full (8,357 characters, retrieved September 3, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms cleanspark 8-K exhibit (clsk-ex99_1.htm)
Quote: “447 acres at the Brazoria campus, where transmission-level infrastructure supports an initial 300 MW demand load with the potential to expand to 600 MW”
