NVIDIA GB200 GPU shipment receipt
Company: WhiteFiber
The claim, verbatim
Received first shipment of NVIDIA GB200 NVL72 GPU servers with GB200 Grace Blackwell Superchips in April 2025 from Quanta Cloud Technology
Source (primary)
WhiteFiber 10-K filed 2026-03-26 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “In April 2025, we received our first shipment of NVIDIA GB200 NVL72 GPU server powered NVIDIA GB200 Grace Blackwell Superchips., from Quanta Cloud Technology, a global leading Original Design Manufacturer (ODM).”
How we checked this
Checked on September 15, 2026. The cited source supports every part of this claim.
The filing states that the first GB200 NVL72 server shipment was received from Quanta Cloud Technology in April 2025.
Confirmed in the source:
- The company received its first shipment of NVIDIA GB200 NVL72 GPU servers
- The servers are powered by GB200 Grace Blackwell Superchips
- The shipment arrived in April 2025
- The supplier was Quanta Cloud Technology
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/2042022/000121390026034341/ea0278305-10k_white.htm) in full (600,249 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms WhiteFiber 10-K filed 2026-03-26
Quote: “In April 2025, we received our first shipment of NVIDIA GB200 NVL72 GPU server powered NVIDIA GB200 Grace Blackwell Superchips., from Quanta Cloud Technology, a global leading Original Design Manufacturer (ODM).”