Lake Mariner HPC data center power capacity
Company: TeraWulf - Project: Akela Data
The claim, verbatim
The Premises will provide more than 200 megawatts of critical IT load for high-performance computing data center operations
Source (primary)
TeraWulf 8-K filed 2025-08-14 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “The Premises will provide more than 200 megawatts (MW) of critical IT load for high-performance computing ("HPC") data center operations”
How we checked this
Checked on September 17, 2026. The cited source supports every part of this claim.
The filing states that the Premises will provide more than 200 megawatts of critical IT load for HPC data center operations.
Confirmed in the source:
- The Premises will provide more than 200 MW of critical IT load
- The capacity is for high-performance computing data center operations
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000110465925078084/tm2523008d2_8k.htm) in full (11,558 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf 8-K filed 2025-08-14
Quote: “The Premises will provide more than 200 megawatts (MW) of critical IT load for high-performance computing ("HPC") data center operations”
