Lake Mariner contracted HPC capacity
Company: TeraWulf - Project: Lake Mariner Anthropic AI Factory
The claim, verbatim
La Lupa and Akela collectively represent 438 MW of contracted critical IT HPC capacity at Lake Mariner
Source (primary)
TeraWulf 424B5 filed 2026-04-15 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “Collectively, La Lupa and Akela represent 438 MW of contracted critical IT HPC capacity at the Lake Mariner Data Campus”
How we checked this
Checked on September 15, 2026. The cited source supports every part of this claim.
The filing states this 438 MW figure directly.
Confirmed in the source:
- La Lupa and Akela collectively represent 438 MW of contracted critical IT HPC capacity at Lake Mariner
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000110465926043376/tm2611661-6_424b5.htm) in full (221,840 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf 424B5 filed 2026-04-15
Quote: “Collectively, La Lupa and Akela represent 438 MW of contracted critical IT HPC capacity at the Lake Mariner Data Campus”
