The Cayuga Site has the potential to support up to 400 MW of gross capacity, representing approximately 320 MW of contractual critical IT load, upon completion of permitting and site development.
Source (primary)
TeraWulf 424B5 filed 2026-04-16 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “upon completion of permitting and site development, has the potential to support up to 400 MW of gross capacity, representing approximately 320 MW of contractual critical IT load.”
How we checked this
Checked on September 15, 2026. The cited source supports every part of this claim.
The filing gives these capacity figures for the Cayuga Site and conditions them on completion of permitting and site development.
Confirmed in the source:
- The Cayuga Site has the potential to support up to 400 MW of gross capacity
- This represents approximately 320 MW of contractual critical IT load
- The potential depends on completion of permitting and site development
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000110465926044031/tm2611661-8_424b5.htm) in full (226,161 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf 424B5 filed 2026-04-16
Quote: “upon completion of permitting and site development, has the potential to support up to 400 MW of gross capacity, representing approximately 320 MW of contractual critical IT load.”