Hawesville Site power availability
Company: TeraWulf - Project: Justified Data
The claim, verbatim
The Hawesville Site has up to 480 MW of gross power availability
Source (primary)
TeraWulf 424B5 filed 2026-04-14 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “The Hawesville Site has up to 480 MW of gross power availability; construction is expected to commence in 2026, with a phased buildout extending through 2027”
How we checked this
Checked on September 15, 2026. The cited source supports every part of this claim.
The document states the Hawesville Site has up to 480 MW of gross power availability.
Confirmed in the source:
- The Hawesville Site has up to 480 MW of gross power availability
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000110465926043250/tm2611661-3_424b5.htm) in full (221,842 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf 424B5 filed 2026-04-14
Quote: “The Hawesville Site has up to 480 MW of gross power availability; construction is expected to commence in 2026, with a phased buildout extending through 2027”