Existing transmission infrastructure capacity
Company: TeraWulf - Project: Justified Data
The claim, verbatim
The facility site has access to approximately 482 megawatts of existing transmission capacity from the former smelter.
Source (primary)
PSC approves power agreement for TeraWulf data campus - Spectrum News (-, news_article)
View cached copy (2026-09-01)Live source ↗
Quote: “it has access to about 482 megawatts of existing transmission capacity left from the former smelter.”
How we checked this
Checked on September 15, 2026. The cited source supports every part of this claim.
Citing a release, the article states that the site has access to about 482 megawatts of existing transmission capacity left from the former smelter.
Confirmed in the source:
- The site has access to about 482 megawatts of existing transmission capacity
- That transmission capacity is left over from the former smelter
What we did: Read our cached copy of the publisher (https://spectrumnews1.com/ky/louisville/news/2026/08/24/psc-terawulf-approval) in full (6,325 characters, retrieved September 1, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms PSC approves power agreement for TeraWulf data campus - Spectrum News
Quote: “it has access to about 482 megawatts of existing transmission capacity left from the former smelter.”