Existing transmission infrastructure at site
Company: TeraWulf - Project: Justified Data
The claim, verbatim
The Justified Data Campus site has approximately 482 MW of existing transmission infrastructure
Source (primary)
Kentucky regulators approve 482 MW power deal for TeraWulf’s Justified Data Campus - W.Media (-, news_article)
View cached copy (2026-09-01)Live source ↗
Quote: “The site has approximately 482 MW of existing transmission infrastructure.”
How we checked this
Checked on September 15, 2026. The cited source supports every part of this claim.
The article says the former smelter site has approximately 482 MW of existing transmission infrastructure.
Confirmed in the source:
- The Justified Data Campus site has approximately 482 MW of existing transmission infrastructure
What we did: Read our cached copy of the publisher (https://w.media/kentucky-regulators-approve-482-mw-power-deal-for-terawulfs-justified-data-campus/) in full (7,954 characters, retrieved September 1, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Kentucky regulators approve 482 MW power deal for TeraWulf’s Justified Data Campus - W.Media
Quote: “The site has approximately 482 MW of existing transmission infrastructure.”