Dedicated 345-kV substation construction for Muskie campus

Company: TeraWulf - Project: Muskie Data

Subject kind
facility timeline
Statement date
2026-08-21
Current status
stated

The claim, verbatim

Kentucky Power is building a dedicated 345-kilovolt substation connected to the existing 765-kV transmission network to support the Muskie campus

Source (primary)

TeraWulf Just Locked Up Another 1 GW AI Site – And Retail Traders Are Paying Attention - Stocktwits (-, news_article)
View cached copy (2026-08-31)Live source ↗

Quote: “Kentucky Power, a subsidiary of American Electric Power (AEP), was building a dedicated 345-kilovolt (kV) substation connected to the existing 765-kV transmission network”

How we checked this

Attempted on September 14, 2026. We could not read enough of the cited source to check this claim.

The verification run did not return a result for this claim (claude -p exit 1: b'').

What we did: Read our cached copy of the publisher (https://stocktwits.com/news-articles/markets/equity/terawulf-rallying-today-ai-data-center/cZgO3ieReqO) in full (5,393 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms TeraWulf Just Locked Up Another 1 GW AI Site – And Retail Traders Are Paying Attention - Stocktwits

Quote: “Kentucky Power, a subsidiary of American Electric Power (AEP), was building a dedicated 345-kilovolt (kV) substation connected to the existing 765-kV transmission network”