Cayuga Site - 320 MW contractual capacity potential
Company: TeraWulf - Project: Cayuga Site
The claim, verbatim
The Cayuga Site in Lansing, New York holds a long-term ground lease with potential to support up to 320 MW of contractual critical IT load upon completion of permitting and site development
Source (primary)
View 10-K PDF (IR page (investors.terawulf.com), ir_release)
View cached copy (2026-09-01)Live source ↗Archive.org ↗
Quote: “the Company holds a long‑term ground lease in Lansing, New York (the "Cayuga Site"), which, upon completion of permitting and site development, has the potential to support up to 400 MW of gross capacity, representing approximately 320 MW of contractual critical IT load.”
How we checked this
Checked on October 10, 2026. The cited source supports every part of this claim.
The filing supports the Cayuga figures. However, it gives 320 MW as an approximate critical IT figure, while the 'up to' ceiling applies to the 400 MW gross capacity.
Confirmed in the source:
- TeraWulf holds a long-term ground lease for the Cayuga Site in Lansing, New York
- Upon completion of permitting and site development, the Cayuga Site has the potential to support approximately 320 MW of contractual critical IT load (up to 400 MW of gross capacity)
What we did: Read our cached copy of IR page (investors.terawulf.com) (https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000031/0001083301-26-000031.pdf) in full (556,251 characters, retrieved September 1, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms View 10-K PDF
Quote: “the Company holds a long‑term ground lease in Lansing, New York (the "Cayuga Site"), which, upon completion of permitting and site development, has the potential to support up to 400 MW of gross capacity, representing approximately 320 MW of contractual critical IT load.”