Abernathy HPC Campus 168 MW capacity
Company: TeraWulf - Project: Abernathy HPC Campus
The claim, verbatim
Abernathy HPC Campus designed for 168 MW critical IT load representing full build-out, fully pre-leased to Fluidstack under 25-year data center lease
Source (primary)
TeraWulf 10-K filed 2026-02-27 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “The Abernathy HPC Campus is designed for 168 MW critical IT load, representing the full build-out of the site. This capacity is fully pre-leased to Fluidstack USA III under a 25-year data center lease”
How we checked this
Checked on September 16, 2026. The cited source supports every part of this claim.
The 10-K states the 168 MW full build-out, the full pre-lease to Fluidstack USA III, and the 25-year lease term.
Confirmed in the source:
- The Abernathy HPC Campus is designed for 168 MW of critical IT load, representing full build-out of the site
- The capacity is fully pre-leased to Fluidstack USA III
- The Abernathy lease has a 25-year term
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000108330126000031/wulf-20251231.htm) in full (490,491 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf 10-K filed 2026-02-27
Quote: “The Abernathy HPC Campus is designed for 168 MW critical IT load, representing the full build-out of the site. This capacity is fully pre-leased to Fluidstack USA III under a 25-year data center lease”