Contracted power capacity deployment

Company: CoreWeave

Subject kind
facility capacity
Statement date
2026-03-01
Promised amount
3100.0 MW
Current status
stated

The claim, verbatim

Total contracted power capacity of approximately 3.1 GW expected to be deployed over future periods

Source (primary)

CoreWeave 10-K filed 2026-03-02 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗

Quote: “As of December 31, 2025, our total contracted power capacity was approximately 3.1 GW, which we expect to deploy over future periods.”

How we checked this

Checked on September 16, 2026. The cited source supports every part of this claim.

The 10-K states the approximately 3.1 GW of contracted power capacity and the expectation to deploy it over future periods.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1769628/000176962826000104/crwv-20251231.htm) in full (630,662 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms CoreWeave 10-K filed 2026-03-02

Quote: “As of December 31, 2025, our total contracted power capacity was approximately 3.1 GW, which we expect to deploy over future periods.”

View cached copy (2026-08-31)Live source ↗