Total leased customer power capacity
Company: Core Scientific
The claim, verbatim
Total leased customer power capacity is roughly 1.1 GW across seven U.S. states
Source (primary)
Applied Digital and IREN Climb 6% as the Digital Infrastructure Bid Broadens Past Bitcoin, Core Scientific Gains 4% - 24/7 Wall St. (-, news_article)
View cached copy (2026-09-01)Live source ↗
Quote: “Total leased customer power capacity at Core Scientific runs roughly 1.1 GW across seven U.S. states”
How we checked this
Checked on October 10, 2026. The cited source supports every part of this claim.
The article states that total leased customer power capacity at Core Scientific runs roughly 1.1 GW across seven U.S. states.
Confirmed in the source:
- Core Scientific's total leased customer power capacity is roughly 1.1 GW
- Core Scientific's leased capacity spans seven U.S. states
What we did: Read our cached copy of the publisher (https://247wallst.com/investing/2026/08/25/applied-digital-and-iren-climb-6-as-the-digital-infrastructure-bid-broadens-past-bitcoin-core-scientific-gains-4/) in full (12,636 characters, retrieved September 1, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Applied Digital and IREN Climb 6% as the Digital Infrastructure Bid Broadens Past Bitcoin, Core Scientific Gains 4% - 24/7 Wall St.
Quote: “Total leased customer power capacity at Core Scientific runs roughly 1.1 GW across seven U.S. states”
confirms Applied Digital and IREN Climb 6% as the Digital Infrastructure Bid Broadens Past Bitcoin, Core Scientific Gains 4% - Yahoo Finance
Quote: “Total leased customer power capacity at Core Scientific runs roughly 1.1 GW across seven U.S. states”
