CoreWeave contracted infrastructure capacity
Company: Core Scientific
The claim, verbatim
Approximately 590 MW of contracted colocation infrastructure supported by approximately 800 MW gross power allocation
Source (primary)
Investor Conference Call Presentation (IR page (investors.corescientific.com), ir_presentation)
View cached copy (2026-09-01)Live source ↗Archive.org ↗
Quote: “~590 MW infrastructure (~800 MW gross)”
How we checked this
Checked on October 17, 2026. The cited source supports every part of this claim.
The presentation's CoreWeave contract summary lists '~590 MW infrastructure (~800 MW gross)'. Its site-by-site table also totals about 590 MW of contracted high-density colocation capacity.
Confirmed in the source:
- Core Scientific's CoreWeave contracts cover approximately 590 MW of contracted colocation infrastructure
- That approximately 590 MW of infrastructure corresponds to approximately 800 MW of gross power
What we did: Read our cached copy of IR page (investors.corescientific.com) (https://d1io3yog0oux5.cloudfront.net/_eb9c314ac28438fbd39d12d91c4e5bdc/corescientific/db/1066/11263/pdf/Core+Scientific+Investor+Update+Presentation+FINAL.pdf) in full (11,378 characters, retrieved September 1, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Investor Conference Call Presentation
Quote: “~590 MW infrastructure (~800 MW gross)”
confirms Investor Conference Call Presentation
Quote: “~590 MW infrastructure (~800 MW gross) ... 12-year contracts with two 5-year options”