jain.com

Black Pearl Facility capacity

Company: Cipher Mining - Project: Black Pearl Facility

Subject kind
facility capacity
Statement date
2026-08-03
Promised amount
300.0 MW
Current status
stated

The claim, verbatim

Cipher has a 300 MW data center in Wink, Texas being retrofitted for HPC hosting

Source (primary)

Cipher Mining 10-Q filed 2026-08-04 (SEC EDGAR, sec_filing)
View cached copy (2026-08-30)Live source ↗

Quote: “The Company also has a 300 MW data center in Wink, Texas that draws power from the power grid (the "Black Pearl Facility") that was previously used for bitcoin mining. The Company is in the process of retrofitting the Black Pearl Facility for an HPC tenant”

How we checked this

Checked on September 2, 2026. The cited source supports every part of this claim.

Note 1 describes the 300 MW Wink, Texas facility and its ongoing retrofit for an HPC tenant.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1819989/000181998926000041/cifr-20260630.htm) in full (220,815 characters, retrieved August 30, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms Cipher Mining 10-Q filed 2026-08-04

Quote: “The Company also has a 300 MW data center in Wink, Texas that draws power from the power grid (the "Black Pearl Facility") that was previously used for bitcoin mining. The Company is in the process of retrofitting the Black Pearl Facility for an HPC tenant”

View cached copy (2026-08-30)Live source ↗