Barber Lake Facility Phase II power capacity
Company: Cipher Mining - Project: Barber Lake Facility
The claim, verbatim
Phase II of Barber Lake Facility provides an additional 39 MW of critical IT load capacity
Source (primary)
Cipher Mining 8-K filed 2025-11-20 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “The A&R Fluidstack Lease entitles Fluidstack to an additional 39 MW of critical IT load in a second phase of development ("Phase II").”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms Cipher Mining 8-K filed 2025-11-20
Quote: “The A&R Fluidstack Lease entitles Fluidstack to an additional 39 MW of critical IT load in a second phase of development ("Phase II").”