jain.com

Barber Lake Facility Phase I power capacity

Company: Cipher Mining - Project: Barber Lake Facility

Subject kind
facility capacity
Statement date
2025-11-20
Promised amount
168.0 MW
Current status
stated

The claim, verbatim

Phase I of Barber Lake Facility provides 168 MW of critical IT load capacity for high-performance computing data center operations

Source (primary)

Cipher Mining 8-K filed 2025-11-20 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗

Quote: “Under the Original Fluidstack Lease, Fluidstack was entitled to 168 megawatts (MW) of critical IT load for high-performance computing data center operations.”

How we checked this

Attempted on September 16, 2026. We could not read enough of the cited source to check this claim.

The verification run did not return a result for this claim (claude -p exit 1: b'').

What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1819989/000095010325015073/dp237633_8k.htm) in full (14,394 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms Cipher Mining 8-K filed 2025-11-20

Quote: “Under the Original Fluidstack Lease, Fluidstack was entitled to 168 megawatts (MW) of critical IT load for high-performance computing data center operations.”

View cached copy (2026-08-31)Live source ↗