Develops campuses using standardized, franchise-style design engineered to deliver state-of-the-art data centers of approximately 150 MW in approximately 14 to 18 months, with low water usage.
Source (primary)
View 10-K (IR page (ir.applieddigital.com), ir_release)
View cached copy (2026-09-01)Live source ↗Archive.org ↗
Quote: “We develop our campuses using a standardized, franchise-style design that is engineered to deliver state-of-the-art data centers of approximately 150 MW in approximately 14 to 18 months, with low water usage.”
How we checked this
Checked on October 10, 2026. The cited source supports every part of this claim.
The filing's competitive strengths section describes the standardized design delivering about 150 MW in about 14 to 18 months with low water usage.
Confirmed in the source:
- The company develops campuses using a standardized, franchise-style design
- The design is engineered to deliver data centers of approximately 150 MW in approximately 14 to 18 months
- The design features low water usage
What we did: Read our cached copy of IR page (ir.applieddigital.com) (https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/0001144879-26-000048.pdf) in full (630,756 characters, retrieved September 1, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms View 10-K
Quote: “We develop our campuses using a standardized, franchise-style design that is engineered to deliver state-of-the-art data centers of approximately 150 MW in approximately 14 to 18 months, with low water usage.”