AI factory standardized design

Company: Applied Digital

Subject kind
product
Statement date
2026-07-28
Promised amount
150.0 MW
Current status
stated

The claim, verbatim

Standardized, franchise-style AI factory design engineered to deliver state-of-the-art data centers of approximately 150 MW in approximately 14 to 18 months with low water usage

Source (primary)

Applied Digital 10-K filed 2026-07-29 (SEC EDGAR, sec_filing)
View cached copy (2026-08-30)Live source ↗

Quote: “We develop our campuses using a standardized, franchise-style design that is engineered to deliver state-of-the-art data centers of approximately 150 MW in approximately 14 to 18 months, with low water usage.”

How we checked this

Checked on September 13, 2026. The cited source supports every part of this claim.

The 10-K describes the standardized design with these capacity, timing and water-usage characteristics.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm) in full (594,188 characters, retrieved August 30, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms Applied Digital 10-K filed 2026-07-29

Quote: “We develop our campuses using a standardized, franchise-style design that is engineered to deliver state-of-the-art data centers of approximately 150 MW in approximately 14 to 18 months, with low water usage.”

View cached copy (2026-08-30)Live source ↗