100 MW facility with liquid-cooled HPC infrastructure
Company: Applied Digital
The claim, verbatim
New 369,000-square-foot facility with ultra-low-cost, highly efficient liquid-cooled infrastructure designed for HPC applications
Source (primary)
Earnings Release (IR page (ir.applieddigital.com), earnings_call)
View cached copy (2026-09-01)Live source ↗Archive.org ↗
Quote: “The new 369,000-square-foot building will provide ultra-low-cost and highly efficient liquid-cooled infrastructure for HPC applications.”
How we checked this
Checked on September 16, 2026. The cited source supports every part of this claim.
The HPC hosting update gives the 369,000-square-foot size and the liquid-cooled HPC design description; the release presents this as the design of a 100 MW building still under construction rather than a completed facility.
Confirmed in the source:
- The new Ellendale building is 369,000 square feet
- The building is designed to provide ultra-low-cost, highly efficient liquid-cooled infrastructure for HPC applications
What we did: Read our cached copy of IR page (ir.applieddigital.com) (https://ir.applieddigital.com/news-events/press-releases/detail/105/applied-digital-reports-fiscal-fourth-quarter-and-full-year/) in full (35,024 characters, retrieved September 1, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Earnings Release
Quote: “The new 369,000-square-foot building will provide ultra-low-cost and highly efficient liquid-cooled infrastructure for HPC applications.”
