1.2 GW power generation facility capacity
Company: Applied Digital
The claim, verbatim
The Design-Build Agreement contemplates engineering, procurement, construction, and commissioning of a power generation facility with an expected nameplate capacity of approximately 1.2 GW to support Applied Digital's data center operations.
Source (primary)
Applied Digital 8-K filed 2026-03-04 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “The Design-Build Agreement contemplates the engineering, procurement, construction and commissioning of a power generation facility with an expected nameplate capacity of approximately 1.2 GW anticipated to support power needs for data center operations”
How we checked this
Checked on September 16, 2026. The cited source supports part of this claim, but not all of it.
The capacity and scope of work match the filing, but the filing says the facility supports 'data center operations' generally and only potentially Applied Digital's own campuses under future separate agreements, so attributing it to Applied Digital's operations overstates the source.
Confirmed in the source:
- The Design-Build Agreement contemplates engineering, procurement, construction and commissioning of a power generation facility
- The facility has an expected nameplate capacity of approximately 1.2 GW
- The facility is anticipated to support power needs for data center operations
We could not confirm this from the cited source:
- That the facility will support Applied Digital's own data center operations, which the filing describes only as a potential future arrangement under separate power supply agreements not yet entered into
That does not mean it is false — only that this source does not establish it, as of the date above. If we find a source that settles it, we will re-check and update this page.
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1144879/000149315226008849/form8-k.htm) in full (11,125 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Applied Digital 8-K filed 2026-03-04
Quote: “The Design-Build Agreement contemplates the engineering, procurement, construction and commissioning of a power generation facility with an expected nameplate capacity of approximately 1.2 GW anticipated to support power needs for data center operations”