Childress single-site expansion to 600MW
Company: IREN - Project: Childress
The claim, verbatim
Childress (Texas) is planned as a single-site expansion with potential full build-out to 600MW.
Source (primary)
iren 8-K exhibit (ef20010616_ex99-2.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-20)Live source ↗
Quote: “if Childress is fully built-out to 600MW”
How we checked this
Checked on November 21, 2026. The cited source supports every part of this claim.
The growth slide labels the program a single-site expansion. Its footnote describes Childress being fully built out to 600MW.
Confirmed in the source:
- The Childress site is in Texas
- Childress growth is presented as a single-site expansion
- Childress has a potential full build-out of 600MW
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1878848/000114036123043825/ef20010616_ex99-2.htm) in full (32,066 characters, retrieved November 20, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms iren 8-K exhibit (ef20010616_ex99-2.htm)
Quote: “if Childress is fully built-out to 600MW”