Childress 600MW site power capacity
Company: IREN - Project: Childress
The claim, verbatim
The Childress site has 600MW of total power capacity available, which the company owns key infrastructure for.
Source (primary)
iren 8-K exhibit (ef20012021_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-18)Live source ↗
Quote: “with 600MW of total power capacity available at the site”
How we checked this
Checked on November 21, 2026. The cited source supports every part of this claim.
The update says the company's ownership of key infrastructure at Childress provides a growth pathway, with 600MW of total power capacity available at the site.
Confirmed in the source:
- The Childress site has 600MW of total power capacity available
- The company owns key infrastructure at the Childress site
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1878848/000114036123047077/ef20012021_ex99-1.htm) in full (23,783 characters, retrieved November 18, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms iren 8-K exhibit (ef20012021_ex99-1.htm)
Quote: “with 600MW of total power capacity available at the site”