HPC build cost ~$6MM/MW; 70-80% construction debt
Company: Applied Digital
The claim, verbatim
Anticipated HPC build cost of about $6MM per MW, targeting 70%-80% of construction cost financed by a traditional construction facility, with equity potentially funded by a partner.
Source (primary)
applied-digital 8-K exhibit (cfosummary10122023.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-18)Live source ↗
Quote: “Anticipated build cost of ~$6 MM per MW for our new design. Targeting 70% to 80% of construction cost financed by a traditional construction facility, with the equity portion potentially funded by a partner.”
How we checked this
Checked on November 20, 2026. The cited source supports every part of this claim.
The HPC slide states the build cost, construction financing target, and possible partner equity funding.
Confirmed in the source:
- Anticipated HPC build cost is about $6MM per MW for the new design
- The company targets financing 70%-80% of construction cost with a traditional construction facility
- The equity portion may be funded by a partner
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1144879/000114487923000216/cfosummary10122023.htm) in full (14,209 characters, retrieved November 18, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms applied-digital 8-K exhibit (cfosummary10122023.htm)
Quote: “Anticipated build cost of ~$6 MM per MW for our new design. Targeting 70% to 80% of construction cost financed by a traditional construction facility, with the equity portion potentially funded by a partner.”