Wyoming mining facility expansion
Company: CleanSpark - Project: Wyoming Property
The claim, verbatim
Two Wyoming mining locations under construction expected to become operational between first and second quarter of fiscal year 2025 with approximately 75 MW of data center capacity
Source (primary)
CleanSpark 10-K filed 2024-12-03 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “We have two separate mining locations in Wyoming that are under construction and are expected to be operational between the first and second quarter of fiscal year 2025. These locations will include miners that are cooled through immersion technology, a method of submerging mining hardware in a non-conductive fluid to cool the equipment and improve its efficiency, and are expected to have approximately 75 MW of data center infrastructure power under contract.”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms CleanSpark 10-K filed 2024-12-03
Quote: “We have two separate mining locations in Wyoming that are under construction and are expected to be operational between the first and second quarter of fiscal year 2025. These locations will include miners that are cooled through immersion technology, a method of submerging mining hardware in a non-conductive fluid to cool the equipment and improve its efficiency, and are expected to have approximately 75 MW of data center infrastructure power under contract.”