Lake Mariner near-term expansion capacity
Company: TeraWulf - Project: Akela Data
The claim, verbatim
Lake Mariner designed to expand up to 500 MW in the near term
Source (primary)
TeraWulf 424B5 filed 2025-05-09 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “Lake Mariner is designed for scalable growth, with the capacity to expand up to 500 megawatts ("MW") in the near term”
How we checked this
Checked on September 17, 2026. The cited source supports every part of this claim.
The filing states that Lake Mariner is designed for scalable growth, with capacity to expand up to 500 MW in the near term.
Confirmed in the source:
- Lake Mariner is designed to expand up to 500 MW in the near term
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000162828025024284/terawulf424b5.htm) in full (154,675 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf 424B5 filed 2025-05-09
Quote: “Lake Mariner is designed for scalable growth, with the capacity to expand up to 500 megawatts ("MW") in the near term”
