Operational infrastructure: 160 MW Lake Mariner + 50 MW Nautilus
Company: TeraWulf - Project: Nautilus
The claim, verbatim
Operational infrastructure capacity is 160 MW at the Lake Mariner facility and 50 MW at the Nautilus Cryptomine, 210 MW combined.
Source (primary)
terawulf 8-K exhibit (wulfmar24opsreport04-1x2.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-08)Live source ↗
Quote: “Operational infrastructure capacity consists of 160 MW at the Lake Mariner facility and 50 MW at the Nautilus Cryptomine”
How we checked this
Checked on November 10, 2026. The cited source supports every part of this claim.
The document states 160 MW at Lake Mariner and 50 MW at Nautilus Cryptomine. The 210 MW total is the direct sum of those two figures.
Confirmed in the source:
- Operational infrastructure capacity at TeraWulf's Lake Mariner facility is 160 MW
- Operational infrastructure capacity at the Nautilus Cryptomine is 50 MW
- Combined operational infrastructure capacity is 210 MW (the sum of the two stated figures)
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1083301/000108330124000082/wulfmar24opsreport04-1x2.htm) in full (9,459 characters, retrieved November 8, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms terawulf 8-K exhibit (wulfmar24opsreport04-1x2.htm)
Quote: “Operational infrastructure capacity consists of 160 MW at the Lake Mariner facility and 50 MW at the Nautilus Cryptomine”