Company: IREN - Project: Childress
The claim, verbatim
Childress Phases 4-6 have 300MW of power available, with timing to be determined.
Source (primary)
iren 8-K exhibit (ef20026073_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-08)Live source ↗
Quote: “Childress Phase 4-6 (Texas, USA) 300 TBD Power available”
How we checked this
Checked on November 10, 2026. The cited source supports part of this claim, but not all of it.
The capacity table lists Childress Phases 4-6 at 300MW with status 'Power available' and a 'TBD' entry. The table has both a hashrate (EH/s) column and a timing column, and the row does not make clear which one 'TBD' fills, so the document does not clearly establish that the timing is undetermined.
Confirmed in the source:
- Childress Phases 4-6 in Texas have 300MW of capacity listed with power available
We could not confirm this from the cited source:
- The timing of Childress Phases 4-6 is to be determined
That does not mean it is false — only that this source does not establish it, as of the date above. If we find a source that settles it, we will re-check and update this page.
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1878848/000114036124017811/ef20026073_ex99-1.htm) in full (16,971 characters, retrieved November 8, 2026) and checked each assertion in the claim against it.