Childress data center expansion to 750MW
Company: IREN
What the later record shows
Partly delivered
By mid-2025, 650MW of the 750MW Childress site was operating. The remaining Horizon 1 and expansion capacity was still under construction or only power-available.
“Childress BTC Mining (Texas, USA) 650 40.1 Operating Total Operating 810 50.0 Childress Horizon 1 (Texas, USA) 75 N/A Under construction”
2025-08-27 · IREN 10-K filed 2025-08-28 View cached copy (2026-08-31)Live source ↗
Checked October 20, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
IREN targets 750MW of data center capacity at Childress in the second half of 2025.
Source (primary)
iren 8-K exhibit (irenlimited-exx994dec2024.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-20)Live source ↗
Quote: “and 750MW in the second half of 2025”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms iren 8-K exhibit (irenlimited-exx994dec2024.htm)
Quote: “and 750MW in the second half of 2025”