Sweetwater 2 energization
Company: IREN
The claim, verbatim
IREN is developing a new 600MW Sweetwater 2 site, with energization expected in 2028, creating a 2GW Sweetwater Data Center Hub.
Source (primary)
iren 8-K exhibit (q2fy25resultspresentatio.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-20)Live source ↗
Quote: “New 600MW Sweetwater 2 site Finalizing 600MW grid-connection agreement Grid network studies complete Energization expected in 2028”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms iren 8-K exhibit (q2fy25resultspresentatio.htm)
Quote: “New 600MW Sweetwater 2 site Finalizing 600MW grid-connection agreement Grid network studies complete Energization expected in 2028”
confirms iren 8-K exhibit (q2fy25resultspressreleas.htm)
Quote: “Sweetwater 2 energization expected in 2028 (600MW)”