British Columbia sites installed capacity
Company: IREN
The claim, verbatim
IREN's going-concern forecast assumes three operational sites in British Columbia, Canada with 160MW of installed nameplate capacity: 80MW at Mackenzie, 50MW at Prince George and 30MW at Canal Flats.
Source (primary)
iren 8-K exhibit (iren-20240930_d2.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-18)Live source ↗
Quote: “Three operational sites in British Columbia, Canada with installed nameplate capacity of 160MW; 80MW Mackenzie, 50MW Prince George and 30MW Canal Flats”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms iren 8-K exhibit (iren-20240930_d2.htm)
Quote: “Three operational sites in British Columbia, Canada with installed nameplate capacity of 160MW; 80MW Mackenzie, 50MW Prince George and 30MW Canal Flats”