1.2 GW contracted power portfolio
Company: Core Scientific
The claim, verbatim
Core Scientific has 1.2 GW of contracted power: 745 MW of operational infrastructure and about 455 MW partially completed (355 MW in Denton and Pecos, TX, and 100 MW in Muskogee, OK).
Source (primary)
Core Scientific, Inc. Investor and Analyst Event June 12, 2024 Transcript (IR page (investors.corescientific.com), earnings_call)
View cached copy (2026-10-16)Live source ↗Archive.org ↗
Quote: “we currently have 1.2 gigawatts of contracted power... Of that 1.2 gigawatts, we have 745 megawatts of operational infrastructure... About 455 megawatts are partially completed”
How we checked this
Checked on October 17, 2026. The cited source supports every part of this claim.
The CEO gave this exact breakdown of the 1.2 GW contracted power portfolio, including the split of partially developed capacity by site.
Confirmed in the source:
- Core Scientific has 1.2 gigawatts of contracted power
- 745 MW of that is operational infrastructure
- About 455 MW is partially completed
- About 355 MW of the partially developed capacity is at the Denton and Pecos, Texas sites
- About 100 MW of the partially developed capacity is at Muskogee, Oklahoma
What we did: Read our cached copy of IR page (investors.corescientific.com) (https://d1io3yog0oux5.cloudfront.net/_b76ddaa46c59e7a64138659274ff5f32/corescientific/db/1066/11128/pdf/June_2024_Investor_Day_Transcript_061224.pdf) in full (94,603 characters, retrieved October 16, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Core Scientific, Inc. Investor and Analyst Event June 12, 2024 Transcript
Quote: “we currently have 1.2 gigawatts of contracted power... Of that 1.2 gigawatts, we have 745 megawatts of operational infrastructure... About 455 megawatts are partially completed”