Total >1,200 contracted MW of powered infrastructure
Company: Core Scientific
The claim, verbatim
Company has more than 1,200 contracted MW of powered infrastructure: ~800 MW HPC hosting (570 MW critical IT load) and ~400 MW bitcoin mining.
Source (primary)
Third Quarter Fiscal Year 2024 Earnings Presentation (IR page (investors.corescientific.com), ir_presentation)
View cached copy (2026-10-16)Live source ↗
Quote: “Total >1,200 contracted MW of powered infrastructure HPC Hosting | ~800 MW Bitcoin Mining | ~400 MW”
How we checked this
Checked on October 17, 2026. The cited source supports every part of this claim.
The overview slide states over 1,200 contracted MW, split into ~800 MW HPC hosting (570 MW critical IT load) and ~400 MW bitcoin mining.
Confirmed in the source:
- The company has more than 1,200 contracted MW of powered infrastructure
- About 800 MW of that infrastructure is allocated to HPC hosting
- The HPC hosting allocation includes 570 MW of critical IT load
- About 400 MW of that infrastructure is allocated to bitcoin mining
What we did: Read our cached copy of IR page (investors.corescientific.com) (https://d1io3yog0oux5.cloudfront.net/_b76ddaa46c59e7a64138659274ff5f32/corescientific/db/1066/11130/pdf/Core%2BScientific%2BQ3%2B2024%2BEarnings%2BPresentation.pdf) in full (24,743 characters, retrieved October 16, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Third Quarter Fiscal Year 2024 Earnings Presentation
Quote: “Total >1,200 contracted MW of powered infrastructure HPC Hosting | ~800 MW Bitcoin Mining | ~400 MW”