Vega site capacity
Company: Hut 8 - Project: Vega
The claim, verbatim
The Vega site has a capacity of 205 MW and is a direct-to-chip liquid-cooled data center facility.
Source (primary)
hut-8 8-K exhibit (hut-20250508xex99d1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-15)Live source ↗
Quote: “the 205 MW Vega site”
How we checked this
Checked on October 17, 2026. The cited source supports every part of this claim.
The release calls it 'the 205 MW Vega site' and describes operating processes being developed for 'the direct-to-chip liquid-cooled facility' at the Vega data center.
Confirmed in the source:
- The Vega site has a capacity of 205 MW
- The Vega data center is a direct-to-chip liquid-cooled facility
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1964789/000155837025006847/hut-20250508xex99d1.htm) in full (21,174 characters, retrieved October 15, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms hut-8 8-K exhibit (hut-20250508xex99d1.htm)
Quote: “the 205 MW Vega site”
