Texas wind farm planned capacity 240 MW
Company: Marathon Digital - Project: Hansford County
The claim, verbatim
The acquired Texas wind farm has current and planned capacity of 240 MW once fully energized.
Source (primary)
marathon-digital 8-K exhibit (ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-15)Live source ↗
Quote: “for current and planned capacity of 240 MW once fully energized”
How we checked this
Checked on October 17, 2026. The cited source supports every part of this claim.
The Q1 2025 shareholder letter states MARA acquired the Texas wind farm 'for current and planned capacity of 240 MW once fully energized.' The same letter separately describes the wind farm itself as 114 MW, so the 240 MW figure is the company's stated current-plus-planned capacity, as the claim says.
Confirmed in the source:
- MARA acquired a wind farm in Texas (closed in February, during Q1 2025).
- The acquisition was described as being for current and planned capacity of 240 MW once fully energized.
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1507605/000164117225009348/ex99-1.htm) in full (34,318 characters, retrieved October 15, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms marathon-digital 8-K exhibit (ex99-1.htm)
Quote: “for current and planned capacity of 240 MW once fully energized”