Sweetwater 2 substation energization late 2027
Company: IREN - Project: Sweetwater 2
The claim, verbatim
IREN is targeting substation energization for the 600MW Sweetwater 2 site in late 2027.
Source (primary)
iren 8-K exhibit (irenlimited-exx994mar2025.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-15)Live source ↗
Quote: “We are targeting a substation energization date of April 2026 and late 2027 for Sweetwater 1 and Sweetwater 2, respectively.”
How we checked this
Checked on October 17, 2026. The cited source supports every part of this claim.
The filing identifies Sweetwater 2 as a 600MW site and gives late 2027 as its targeted substation energization date.
Confirmed in the source:
- Sweetwater 2 is a 600MW site
- IREN is targeting a substation energization date of late 2027 for Sweetwater 2
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1878848/000187884825000043/irenlimited-exx994mar2025.htm) in full (129,213 characters, retrieved October 15, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms iren 8-K exhibit (irenlimited-exx994mar2025.htm)
Quote: “We are targeting a substation energization date of April 2026 and late 2027 for Sweetwater 1 and Sweetwater 2, respectively.”
