Childress 750MW liquid-cooling conversion design
Company: IREN - Project: Childress
The claim, verbatim
IREN has begun site design for converting the full 750MW Childress site to liquid cooling.
Source (primary)
iren 8-K exhibit (q3fy25resultspressreleas.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-15)Live source ↗
Quote: “Site design underway for full 750MW liquid-cooling transformation of Childress”
How we checked this
Checked on October 17, 2026. The cited source supports every part of this claim.
The press release states that site design is underway for a full 750MW liquid-cooling transformation of Childress.
Confirmed in the source:
- IREN says site design is underway for converting the full Childress site to liquid cooling
- The planned Childress liquid-cooling conversion covers 750MW
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1878848/000187884825000043/q3fy25resultspressreleas.htm) in full (26,110 characters, retrieved October 15, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms iren 8-K exhibit (q3fy25resultspressreleas.htm)
Quote: “Site design underway for full 750MW liquid-cooling transformation of Childress”
