Justified campus ~482 MW available transmission
Company: TeraWulf - Project: Justified Data
The claim, verbatim
The Justified Data Campus came with an energized substation and about 482 MW of available transmission capability.
Source (primary)
TeraWulf Doubles Kentucky Data Center Power to 1 GW - Engineering News-Record (-, news_article)
View cached copy (2026-10-07)Live source ↗Archive.org ↗
Quote: “Justified came with an energized substation and about 482 MW of available transmission capability”
How we checked this
Checked on October 9, 2026. The cited source supports every part of this claim.
The article states this directly.
Confirmed in the source:
- The Justified Data Campus came with an energized substation
- The Justified Data Campus came with about 482 MW of available transmission capability
What we did: Read our cached copy of the publisher (https://www.enr.com/articles/63799-terawulf-doubles-kentucky-data-center-power-to-1-gw) in full (13,188 characters, retrieved October 7, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf Doubles Kentucky Data Center Power to 1 GW - Engineering News-Record
Quote: “Justified came with an energized substation and about 482 MW of available transmission capability”