Cayuga Phase I 138 MW in 2027
Company: TeraWulf - Project: Cayuga Site
The claim, verbatim
Cayuga to have access to 138 MW of low-cost power in 2027 (Phase I).
Source (primary)
Q2 Earnings Update Presentation (IR page (investors.terawulf.com), ir_presentation)
View cached copy (2026-10-06)Live source ↗
Quote: “Access to 138 MW of low-cost power in 2027”
How we checked this
Checked on October 14, 2026. The cited source supports every part of this claim.
The Cayuga slide lists access to 138 MW of low-cost power in 2027, and its buildout timeline labels +138 MW (2027) as Phase I.
Confirmed in the source:
- Cayuga is to have access to 138 MW of low-cost power in 2027
- The 138 MW in 2027 is labeled Phase I of the buildout
What we did: Read our cached copy of IR page (investors.terawulf.com) (https://d1io3yog0oux5.cloudfront.net/_26c9692236622f11a71632d61560402c/terawulf/db/2396/23302/pdf/WULF_Q2_2025_Investor_Update_%28Aug_2025%29vF.pdf) in full (17,599 characters, retrieved October 6, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Q2 Earnings Update Presentation
Quote: “Access to 138 MW of low-cost power in 2027”
confirms Q2 Earnings Update Presentation
Quote: “+138 MW (2027)”